logo
ProjectPre-Design

Early World Daycare Bridge Replacement

Pre-design · Washington · Last reported Nov 2024

Source: Dodge USA

This proposal funds design, permitting, and construction for replacement of a timber sidewalk and driveway bridge structure and adjacent retaining walls located along the frontage of 13831 NE Bel-Red Road and provides for fish habitat enhancements to Kelsey Creek. The existing timber bridge and sidewalk structure spans Kelsey Creek and was constructed in 1972 as part of the project that widened NE

Status
Prospective
Sector
Government, Forest Products and Packaging, Commercial, Bridge, Car parking, Automotive, Road
Location
Bellevue, Washington, United States of America
Updated
19 Nov 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Early World Daycare Bridge Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Early World Daycare Bridge Replacement” is an infrastructure initiative in the Government sector, located in Bellevue, Washington, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Pre-Design

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

This proposal funds design, permitting, and construction for replacement of a timber sidewalk and driveway bridge structure and adjacent retaining walls located along the frontage of 13831 NE Bel-Red Road and provides for fish habitat enhancements to Kelsey Creek. The existing timber bridge and sidewalk structure spans Kelsey Creek and was constructed in 1972 as part of the project that widened NE Bel-Red Road to its current five-lane configuration. The structure does not meet current America...

Budget

Location

Country

United States of America (USA)

State

Washington

City

Bellevue

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Government, Forest Products and Packaging, Commercial, Bridge, Car parking, Automotive, Road

Article published date

2024-11-25

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project