logo
ProjectClosed

EARTHQUAKE RECONST

The status, timeline and source of this project. A free account opens every field.

Source: World Bank Group

The project consists of: (i) sites and services and materials credits for about 10,000 housing units to be developed in three locations in the Guatemala City metropolitan area; (ii) material credit program for ten departmental capitals severely affected by the earthquake that would help about 8,000 families rebuild homes; (iii) small business development program that would provide credit to produc

Status
Closed
Sector
Bridge, Automotive, Commercial, Government, Manufacturing (Industrial)
Location
Guatemala
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about EARTHQUAKE RECONST

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “EARTHQUAKE RECONST” is an infrastructure initiative in the Bridge sector, located in Guatemala. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project consists of: (i) sites and services and materials credits for about 10,000 housing units to be developed in three locations in the Guatemala City metropolitan area; (ii) material credit program for ten departmental capitals severely affected by the earthquake that would help about 8,000 families rebuild homes; (iii) small business development program that would provide credit to producers of building materials for housing construction, and also provide commercial and industrial outlets to be leased to entrepreneurs in the three sites that will be developed in Guatemala City metropolitan area; (iv) technical assistance equivalent to 108 man-months of specialists services; equipment and vehicles would also be provided; (v) construction of about 13 primary schools to replace destroyed primary schools, of 14 primary schools to be included in the sites and services component of the project, and of 5 lower secondary schools to replace destroyed schools; (vi) limited rehabilitation of Puerto Barrios by converting the existing 350 m long access bridge into a two-berth pier, dredging alongside the pier, and provision of cargo handling equipment; and (vii) a port organization study to help improve the port institutions and planning the Guatemala, and a feasibility study.

Original sector

(Historic)Urban Development

Location

Country

Guatemala

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Bridge, Automotive, Commercial, Government, Manufacturing (Industrial)

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project