East African Crude Oil Pipeline (EACOP) Project
The owner, status and timeline of this project. A free account opens every field.
Source: TotalEnergies.com
The EACOP project consists of constructing a 1,443 km buried oil pipeline from Kabaale in Uganda to the port of Tanga in Tanzania, including a storage terminal and loading jetty. The pipeline includes six pumping stations and a heat tracing system to maintain oil temperature. The route avoids environmentally sensitive areas and crosses mainly farming areas.
- Status
- Under Construction
- Sector
- Road, Oil and Gas, Raw Materials
- Location
- Uganda
- Updated
- 22 Jul 2026
- Source
- TotalEnergies.com
ConstructChat
Ask ConstructChat about East African Crude Oil Pipeline (EACOP) Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Under Construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The EACOP project consists of constructing a 1,443 km buried oil pipeline from Kabaale in Uganda to the port of Tanga in Tanzania, including a storage terminal and loading jetty. The pipeline includes six pumping stations and a heat tracing system to maintain oil temperature. The route avoids environmentally sensitive areas and crosses mainly farming areas. |
Original sector | Oil and Gas |
Location
Country | Uganda |
Source
Source | TotalEnergies.com |
URL |
More Details
Record type | Project |
Sector | Road, Oil and Gas, Raw Materials |
Article published date | 2025-05-24 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
