East African Crude Oil Pipeline (EACOP)
Planned · Uganda · Last reported Jul 2026
Source: RFI
The East African Crude Oil Pipeline (EACOP) is a $5.6 billion project led by TotalEnergies, planned to be the world's longest heated pipeline, running 1,443 km from Uganda's oilfields near Lake Albert to the Tanzanian coastal port of Tanga. The project is set to begin operating in 2027 and has faced legal challenges regarding environmental and constitutional concerns.
- Status
- Prospective
- Sector
- Oil and Gas
- Location
- Uganda
- Updated
- 22 Jul 2026
- Source
- RFI
ConstructChat
Ask ConstructChat about East African Crude Oil Pipeline (EACOP)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The East African Crude Oil Pipeline (EACOP) is a $5.6 billion project led by TotalEnergies, planned to be the world's longest heated pipeline, running 1,443 km from Uganda's oilfields near Lake Albert to the Tanzanian coastal port of Tanga. The project is set to begin operating in 2027 and has faced legal challenges regarding environmental and constitutional concerns. |
Original sector | Energy |
Budget |
Location
Country | Uganda |
Source
Source | RFI |
URL |
More Details
Record type | Project |
Sector | Oil and Gas |
Article published date | 2026-07-11 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
