logo

East African Crude Oil Pipeline (EACOP)

Planned · Uganda · Last reported Jul 2026

Source: RFI

Project
Planned

The East African Crude Oil Pipeline (EACOP) is a $5.6 billion project led by TotalEnergies, planned to be the world's longest heated pipeline, running 1,443 km from Uganda's oilfields near Lake Albert to the Tanzanian coastal port of Tanga. The project is set to begin operating in 2027 and has faced legal challenges regarding environmental and constitutional concerns.

Status
Prospective
Sector
Oil and Gas
Location
Uganda
Updated
22 Jul 2026
Source
RFI

ConstructChat

Ask ConstructChat about East African Crude Oil Pipeline (EACOP)

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “East African Crude Oil Pipeline (EACOP)” is an infrastructure initiative in the Oil and Gas sector, located in Uganda. Taiyo aggregates data on it from RFI.

Participants

Not available for this record.

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The East African Crude Oil Pipeline (EACOP) is a $5.6 billion project led by TotalEnergies, planned to be the world's longest heated pipeline, running 1,443 km from Uganda's oilfields near Lake Albert to the Tanzanian coastal port of Tanga. The project is set to begin operating in 2027 and has faced legal challenges regarding environmental and constitutional concerns.

Original sector

Energy

Budget

Location

Country

Uganda

Source

Source

RFI

URL

More Details

Record type

Project

Sector

Oil and Gas

Article published date

2026-07-11

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project