East African Crude Oil Pipeline (EACOP)
The owner, status and timeline of this project. A free account opens every field.
Source: Pipeline and Gas Journal
The East African Crude Oil Pipeline is set to transport crude oil from Uganda to Tanzania for export, with a length of 898 miles and a target operational date of 2025.
- Status
- Under Construction
- Sector
- LNG, Oil and Gas
- Location
- Uganda
- Updated
- 22 Jul 2026
- Source
- Pipeline and Gas Journal
ConstructChat
Ask ConstructChat about East African Crude Oil Pipeline (EACOP)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Under Construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The East African Crude Oil Pipeline is set to transport crude oil from Uganda to Tanzania for export, with a length of 898 miles and a target operational date of 2025. |
Original sector | Oil |
Location
Country | Uganda |
Source
Source | Pipeline and Gas Journal |
URL |
More Details
Record type | Project |
Sector | LNG, Oil and Gas |
Article published date | 2025-03-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
