East Boardwalk Decking Replacement Phase III
Closed · Michigan · Last reported Dec 2024
Source: Dodge USA
The work includes furnishing all labor, equipment, and materials necessary to complete the work including partial removal and replacement of existing boardwalk decking, removal and replacement of additional wooden boardwalk material, and all incidental construction at Lake St. Clair Metropark in Macomb County, Michigan.
- Status
- Closed
- Sector
- Car parking, Automotive, Commercial, Government, Mass Transit, Manufacturing (Industrial)
- Location
- Harrison Township, Michigan, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about East Boardwalk Decking Replacement Phase III
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The work includes furnishing all labor, equipment, and materials necessary to complete the work including partial removal and replacement of existing boardwalk decking, removal and replacement of additional wooden boardwalk material, and all incidental construction at Lake St. Clair Metropark in Macomb County, Michigan. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Michigan |
City | Harrison Township |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Car parking, Automotive, Commercial, Government, Mass Transit, Manufacturing (Industrial) |
Article published date | 2025-01-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Car parking projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- MIDTOWN CONNECTOR IMPROVEMENTS
- P'TREE IND BLVD PEDESTRIAN CORRIDOR IN CHAMBLEE-LCI PROJECT
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
- School zone beacon replacement project
