logo

East Brampton Watermain Contract 1

Sector: Car parking • Location: Brampton, Ontario, Canada

Source: Dodge USA

Project
Closed

Watermains and ancillary structures. Tunnel Installation: Completion of vertical shafts to accommodate tunnel construction; provide initial support for excavated tunnel and install carrier pipe within tunnel and grout annulus outside carrier pipe; install and support pipe within vertical shafts and extend outside the shafts; backfill annular space in vertical shafts and construct all permanent cha

Status
Closed
Sector
Car parking, Water Supply and Storage, Tunnel, Government, Automotive, Commercial, Waste Processing and Treatment
Location
Brampton, Ontario, Canada
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about East Brampton Watermain Contract 1

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “East Brampton Watermain Contract 1” is an infrastructure initiative in the Car parking sector, located in Brampton, Ontario, Canada. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Watermains and ancillary structures. Tunnel Installation: Completion of vertical shafts to accommodate tunnel construction; provide initial support for excavated tunnel and install carrier pipe within tunnel and grout annulus outside carrier pipe; install and support pipe within vertical shafts and extend outside the shafts; backfill annular space in vertical shafts and construct all permanent chambers such as drain and valve chambers; pre-commissioning or commissioning and testing of install...

Procurement method

Budget

Location

Country

Canada

State

Ontario

City

Brampton

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Car parking, Water Supply and Storage, Tunnel, Government, Automotive, Commercial, Waste Processing and Treatment

Article published date

2024-08-12

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project