East Brownlee Creek Irrigation Diversion
Sector: Water Supply and Storage • Location: Cambridge, Idaho, United States of America
Source: Dodge USA
The project consists of installing a passive end-of-pipe fish screen connected to a steel modular box with slide gate and installing approximately 2,000 feet of underground 6 HDPE pipe. The pipe installation will include an underground creek crossing section of approximately 20+ feet in width.
- Status
- Closed
- Sector
- Water Supply and Storage, Commercial, Raw Materials, Steel, Metal
- Location
- Cambridge, Idaho, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about East Brownlee Creek Irrigation Diversion
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project consists of installing a passive end-of-pipe fish screen connected to a steel modular box with slide gate and installing approximately 2,000 feet of underground 6 HDPE pipe. The pipe installation will include an underground creek crossing section of approximately 20+ feet in width. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Idaho |
City | Cambridge |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Commercial, Raw Materials, Steel, Metal |
Article published date | 2024-11-11 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
