East Channel Bridge Expansion Joint Repair on I-90
One of 10,000+ projects Taiyo tracks in Washington.
Source: My Northwest
The Washington State Department of Transportation (WSDOT) is finishing a project on the East Channel Bridge that started with a failed expansion joint in January 2024. The project involves repairing expansion joints on a one-mile stretch of eastbound I-90 between E. Mercer Way and Bellevue Way, reducing lanes to three and causing backups. The projected completion date is October 5, 2025.
- Status
- Under Construction
- Sector
- Bridge, Road, Government
- Location
- Seattle, Washington, United States of America
- Updated
- 22 Jul 2026
- Source
- My Northwest
ConstructChat
Ask ConstructChat about East Channel Bridge Expansion Joint Repair on I-90
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Washington State Department of Transportation (WSDOT) is finishing a project on the East Channel Bridge that started with a failed expansion joint in January 2024. The project involves repairing expansion joints on a one-mile stretch of eastbound I-90 between E. Mercer Way and Bellevue Way, reducing lanes to three and causing backups. The projected completion date is October 5, 2025. |
Original sector | Transportation |
Location
Country | United States of America (USA) |
State | Washington |
City | Seattle |
Source
Source | My Northwest |
URL |
More Details
Record type | Project |
Sector | Bridge, Road, Government |
Article published date | 2025-09-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Bridge projects in USA
- Widen Turnpike Mainline SR 91 from WPB Service Plaza to Okeechobee Blvd SR 704
- Widen Turnpike from Glades Rd to Atlantic Ave
- Add Auxiliary Lanes Turnpike TSMO from SR 821 to Griffin Road SR 818
- Widen Turnpike from Southern Blvd to Okeechobee Blvd
- Widen Turnpike from West Palm Beach Service Plaza to Southern Blvd
- Widen Turnpike Mainline from Neptune Road to Osceola Parkway
- Sand Lake Interchange
- Polk ParkwaySR 570 Bridge Painting Project in Polk County
