East Cliff/Portola Drives Sewer Manhole Rehabilitation
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
Work includes the repair and rehabilitation of thirteen existing brick manholes and fourteen existing concrete manholes. The work will primarily involves channel repair, step removal, and lining, all of which will occur within the existing paved road right-of-way.
- Status
- Closed
- Sector
- Water Supply and Storage, Cement, Road, Waste Processing and Treatment, Government, Commercial
- Location
- Santa Cruz, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about East Cliff/Portola Drives Sewer Manhole Rehabilitation
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Work includes the repair and rehabilitation of thirteen existing brick manholes and fourteen existing concrete manholes. The work will primarily involves channel repair, step removal, and lining, all of which will occur within the existing paved road right-of-way. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Santa Cruz |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Cement, Road, Waste Processing and Treatment, Government, Commercial |
Article published date | 2024-06-24 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
