East Fifth Street Rehabilitation Project
Sector: Car parking • Location: Oregon, United States of America
Source: Federal Highway Administration (FHWA)
The rehabilitation of East Fifth Street from River Street to Wynooski Street (four blocks) in Newberg, Oregon is one of the first pavement maintenance projects funded by a transportation utility fee (TUF) adopted by the City Council in May 2017. The City had already planned to replace a wastewater line along the route and decided to coordinate reconstruction of the street with that project. The st
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Close |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The rehabilitation of East Fifth Street from River Street to Wynooski Street (four blocks) in Newberg, Oregon is one of the first pavement maintenance projects funded by a transportation utility fee (TUF) adopted by the City Council in May 2017. The City had already planned to replace a wastewater line along the route and decided to coordinate reconstruction of the street with that project. The street had been rated in poor condition and included sidewalks and curbs below standard. Reconstruction involved removal of existing pavement, over-grading the subgrade, and installation of nine inches of crushed rock over the base. The new three-inch thick asphalt surface is an improvement over the prior two-inch surface atop four inches of loosely placed rock. The project included new catch basins and reconstructed sidewalk ramps that meet current ADA standards. A 2015 funding analysis had shown a significant shortfall to properly maintain pavement condition city-wide and increase overall pavement condition index that had been decreasing in recent years. By 2016, available annual revenues of $600,000 from existing state gas tax receipts and federal funds exchange fell far short of the projected $2.5 million needed. In response, the City adopted a TUF to generate an estimated $1.2 million annually to help close the $1.9 million gap. The City settled upon a "variable fee within class" rate model, with three residential (35% of revenues) and six non-residential (65% of revenues) rate classes. The revenue allocation allows a maximum of 70% to go toward preservation of streets rated in good to fair condition, and a minimum of 30% to reconstruct streets rated in poor to very poor condition. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
