logo

East Fifth Street Rehabilitation Project

Sector: Car parking • Location: Oregon, United States of America

Source: Federal Highway Administration (FHWA)

Project
Close

The rehabilitation of East Fifth Street from River Street to Wynooski Street (four blocks) in Newberg, Oregon is one of the first pavement maintenance projects funded by a transportation utility fee (TUF) adopted by the City Council in May 2017. The City had already planned to replace a wastewater line along the route and decided to coordinate reconstruction of the street with that project. The st

Project Information FAQ

Project Information

5 Q
The project “East Fifth Street Rehabilitation Project” is an infrastructure initiative in the Car parking sector, located in Oregon, United States of America. Taiyo aggregates data on it from Federal Highway Administration (FHWA).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Close

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The rehabilitation of East Fifth Street from River Street to Wynooski Street (four blocks) in Newberg, Oregon is one of the first pavement maintenance projects funded by a transportation utility fee (TUF) adopted by the City Council in May 2017. The City had already planned to replace a wastewater line along the route and decided to coordinate reconstruction of the street with that project. The street had been rated in poor condition and included sidewalks and curbs below standard. Reconstruction involved removal of existing pavement, over-grading the subgrade, and installation of nine inches of crushed rock over the base. The new three-inch thick asphalt surface is an improvement over the prior two-inch surface atop four inches of loosely placed rock. The project included new catch basins and reconstructed sidewalk ramps that meet current ADA standards. A 2015 funding analysis had shown a significant shortfall to properly maintain pavement condition city-wide and increase overall pavement condition index that had been decreasing in recent years. By 2016, available annual revenues of $600,000 from existing state gas tax receipts and federal funds exchange fell far short of the projected $2.5 million needed. In response, the City adopted a TUF to generate an estimated $1.2 million annually to help close the $1.9 million gap. The City settled upon a "variable fee within class" rate model, with three residential (35% of revenues) and six non-residential (65% of revenues) rate classes. The revenue allocation allows a maximum of 70% to go toward preservation of streets rated in good to fair condition, and a minimum of 30% to reconstruct streets rated in poor to very poor condition.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data