East Gym Pool Refinishing
Sector: Water Supply and Storage • Location: Binghamton, New York, United States of America
Source: Dodge USA
The pool is approximately 6000 square feet 1"x1" (ceramic Tile) in surface area. Contractor is to measure the dimensions for size. Length 79' x width 37' pool depth is 4 feet to 14 feet, there is a filter trough/gutter that goes around the inside of the pool and there is also an apron around the perimeter. Contractor must inspect pool with water in it. Binghamton University will drain pool. Once p
- Status
- Closed
- Sector
- Water Supply and Storage, Education, Commercial, Manufacturing (Industrial), Waste Processing and Treatment
- Location
- Binghamton, New York, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about East Gym Pool Refinishing
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The pool is approximately 6000 square feet 1"x1" (ceramic Tile) in surface area. Contractor is to measure the dimensions for size. Length 79' x width 37' pool depth is 4 feet to 14 feet, there is a filter trough/gutter that goes around the inside of the pool and there is also an apron around the perimeter. Contractor must inspect pool with water in it. Binghamton University will drain pool. Once pool is drained contract must repair grout as needed and fix/ replace broken or missing tile. Befo... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | New York |
City | Binghamton |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Education, Commercial, Manufacturing (Industrial), Waste Processing and Treatment |
Article published date | 2024-06-24 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
