logo

East Headworks at the Woods Run Wastewater Treatment Plant

Sector: Road • Location: United States of America (USA)

Source: ENR News

Project
Under Planning

Allegheny County Sanitary Authority is planning to construct a new East Headworks at the Woods Run Wastewater Treatment Plant in Pittsburgh, which will increase its peak wet weather capacity to 600 million gallons per day. The East Headworks will serve the plant during normal dry weather conditions, and the West Headworks will be brought online only after plant influent flow reaches approximately

Project Information FAQ

Project Information

5 Q
The project “East Headworks at the Woods Run Wastewater Treatment Plant” is an infrastructure initiative in the Road sector, located in United States of America (USA). Taiyo aggregates data on it from ENR News.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

under planning

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Allegheny County Sanitary Authority is planning to construct a new East Headworks at the Woods Run Wastewater Treatment Plant in Pittsburgh, which will increase its peak wet weather capacity to 600 million gallons per day. The East Headworks will serve the plant during normal dry weather conditions, and the West Headworks will be brought online only after plant influent flow reaches approximately 360 million gallons per day. The East Headworks will receive flow from the main pumping station and the wet weather pumping station via an influent conduit routed parallel to the existing east-west plant road located between the West Headworks and the Headworks odor control facility. A new flow chamber will be constructed to receive flow from the existing pump station as well as the future wet weather pump station. It is being designed by Whitman Requardt & Associates.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data