East Influent Siphon Construction
Sector: Water Supply and Storage • Location: San Bernardino, California, United States of America
Source: Dodge USA
Furnish all material, labor and equipment required to construct the East Influent Siphon Project Phase 1 and 2. The project consists of rehabilitating two (2) existing 36-inch pipelines with Cured-In-Place-Pipe (CIPP) Liner, implementing and maintaining a temporary wastewater bypass for approximately 14-16 million gallons per day (MGD) of projected dry weather flows--including installation of cabl
- Status
- Closed
- Sector
- Water Supply and Storage, Power Generation (CCGT), Telecommunications, Government, Commercial, Waste Processing and Treatment
- Location
- San Bernardino, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about East Influent Siphon Construction
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Furnish all material, labor and equipment required to construct the East Influent Siphon Project Phase 1 and 2. The project consists of rehabilitating two (2) existing 36-inch pipelines with Cured-In-Place-Pipe (CIPP) Liner, implementing and maintaining a temporary wastewater bypass for approximately 14-16 million gallons per day (MGD) of projected dry weather flows--including installation of cables in existing electrical duct bank conduits located on the SBWRP site, followed by demolition of... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | San Bernardino |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Power Generation (CCGT), Telecommunications, Government, Commercial, Waste Processing and Treatment |
Article published date | 2024-01-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
