East Lake Road (CR 2) Preventative Maintenance
Sector: Car parking • Location: Silver Springs, New York, United States of America
Source: Dodge USA
The project primarily includes the milling and resurfacing of 4 miles of pavement on East Lake Road. In addition to the pavement resurfacing, work will include replacement of sidewalk curb ramps not meeting current ADA standards to the extent possible under this maintenance project. Pavement markings will also be restored
- Status
- Closed
- Sector
- Car parking, Road, Automotive, Government, Commercial, Manufacturing (Industrial)
- Location
- Silver Springs, New York, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about East Lake Road (CR 2) Preventative Maintenance
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project primarily includes the milling and resurfacing of 4 miles of pavement on East Lake Road. In addition to the pavement resurfacing, work will include replacement of sidewalk curb ramps not meeting current ADA standards to the extent possible under this maintenance project. Pavement markings will also be restored |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | New York |
City | Silver Springs |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Car parking, Road, Automotive, Government, Commercial, Manufacturing (Industrial) |
Article published date | 2024-03-25 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Car parking projects in United States of America
- FRANKLIN CO. AIRPORT DRIVES & PARKING
- SR 7 FROM FLORIDA STATE LINE TO NSR
- SIMPSON STREET/JONES AVE FM NORTHSIDE DR TO LUCKIE ST- GRTA
- CULVERT & BRIDGE CULVERT DURHAM PARK ROAD
- SR 9 @ CR 3705/AC SMITH RD
- CR 478/MOULTRIE LENOX RD @ LITTLE RVR 9 MI E OF NORMAN PARK
- I-285 FM I-75/CLAYTON THRU FULTON TO I-20/DEKALB
- LINCOLNTON DOWNTOWN STREETSCAPE - PHASE II
