East Lawton Waterline Replacement
Sector: Waste Processing and Treatment • Location: Lawton, Oklahoma, United States of America
Source: Dodge
- A $3,554,617.50 contract to Stampede Utility Construction LLC for replacement of 35,000 feet of high maintenance waterline in an area east of Northeast 45th Street to Northeast 60th Street, south of East Gore Boulevard. The engineering estimate on project was $4,454,787.40, with bids ranging from $3.554 million to $6.2 million. The construction timeline is 180 days.
- Status
- Prospective
- Sector
- Waste Processing and Treatment, Water Supply and Storage, Power Transmission, Road, Power Generation (CCGT), Commercial, Government
- Location
- Lawton, Oklahoma, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about East Lawton Waterline Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planning schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | * A $3,554,617.50 contract to Stampede Utility Construction LLC for replacement of 35,000 feet of high maintenance waterline in an area east of Northeast 45th Street to Northeast 60th Street, south of East Gore Boulevard. The engineering estimate on project was $4,454,787.40, with bids ranging from $3.554 million to $6.2 million. The construction timeline is 180 days. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Oklahoma |
City | Lawton |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Water Supply and Storage, Power Transmission, Road, Power Generation (CCGT), Commercial, Government |
Article published date | 2025-07-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in United States of America
- Imola Avenue Rehabilitation (Soscol Ave to East End)
- Laguna Canyon Road , Road Improvements ( Segment 4 ) ( Phases 2 to 4 )
- Panorama Heights Drainage and Road Improvements
- Modjeska Grade Road , Road and Drainage Improvements
- Street Drainage Improvements ( Annual )
- Barrett Lane Drainage and Sidewalk Improvement
- Ronald Caspers Wilderness Park - Maintenance Building - Renovation
- West Bay Yards
