East London Link
Sector: Water Supply and Storage • Location: Ontario, Canada
Source: Infrastructure Canada
The project consists of creating 6.3 km of dedicated bus lanes by widening the roadway from downtown (King Street) to Fanshawe College and by widening Highbury Bridge (overpass), Highbury Avenue and Oxford Street, and installing intelligent traffic signals with transit signal priority sensors and video along the transit route to reduce intersection delays and shorten travel times, including. Wor
- Status
- Under Construction
- Sector
- Water Supply and Storage, Bridge, Road
- Location
- Ontario, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about East London Link
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | in progress |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project consists of creating 6.3 km of dedicated bus lanes by widening the roadway from downtown (King Street) to Fanshawe College and by widening Highbury Bridge (overpass), Highbury Avenue and Oxford Street, and installing intelligent traffic signals with transit signal priority sensors and video along the transit route to reduce intersection delays and shorten travel times, including. Work will also include installation of 14 transit platforms along the route, creating 3.7 km of cycling facilities and a transit hub at Fanshawe College. The project also includes the purchase of 9 new buses. Concurrent underground work on sewers and water mains will also be undertaken. The on-street cycling network is not well developed, and at present there is limited connectivity in the existing network, with many lanes and paths limited to small segments of a road. This limits the ability of the current cycling network to provide access to current and future transit services. These shortcomings have previously been acknowledged by the City and the Transportation Master Plan. The proposed multi-use pathways and on-street cycling infrastructure will help to fill in these existing gaps and will act as first-mile and last-mile connections to the proposed rapid transit corridors. |
Original sector | Public Transit |
Location
Country | Canada |
State | Ontario |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Bridge, Road |
Article published date | 2026-03-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
