logo

EAST MAIN FM COLLEGE TO HAGAN & HAGAN FM EAST MAIN TO GRACE

Sector: Car parking • Location: Hahira, Georgia, United States of America

Source: Georgia Department of Transportation (GDOT)

Project
Complete

Hahira Sidewalk Project:

  1. East Main Street (and Main Street Ext) from 175 LF east of College Street to Hagen Bridge Road.
  2. Hagen Bridge Road from Main Street Ext to CR 223/Grace Street. The project will construct new sidewalks, creating connectivity between Hahira Elementary and Middle. The proposed sidewalks will connect to existing sidewalks at both termini. Approximately 2500 LF of 5'-wi

Project Information FAQ

Project Information

4 Q
The project “EAST MAIN FM COLLEGE TO HAGAN & HAGAN FM EAST MAIN TO GRACE” is an infrastructure initiative in the Car parking sector, located in Hahira, Georgia, United States of America. Taiyo aggregates data on it from Georgia Department of Transportation (GDOT).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

complete

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Hahira Sidewalk Project: 1. East Main Street (and Main Street Ext) from 175 LF east of College Street to Hagen Bridge Road. 2. Hagen Bridge Road from Main Street Ext to CR 223/Grace Street. The project will construct new sidewalks, creating connectivity between Hahira Elementary and Middle. The proposed sidewalks will connect to existing sidewalks at both termini. Approximately 2500 LF of 5'-wide, 4"-thick concrete sidewalk, 640 LF of 8"x30" concrete curb & gutter along East Main Street, and 1545 LF of 6"x24" curb & gutter along Hagan Bridge Road and Main Street Ext will be constructed. Additionally, 40 LF of 12" storm pipe, 135 LF of 15" storm pipe, 724 LF of 18" storm pipe, 14 LF 30" pipe, 9 drainage structures, and striping are proposed. Also, 7 driveways will be improved along the route with 200 SY of 6" driveway concrete

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data