East Medical Center Drive Bridge Rehabilitation and Widening
The status, timeline and source of this project. A free account opens every field.
Source: MLive
Traffic shifted to east side for third phase of rehabilitation and widening project on East Medical Center Drive Bridge through June 20, 2025, with one vehicle lane in each direction remaining open.
- Status
- Under Construction
- Sector
- Hospital, Bridge, Road
- Location
- Ann Arbor, Michigan, United States of America
- Updated
- 22 Jul 2026
- Source
- MLive
ConstructChat
Ask ConstructChat about East Medical Center Drive Bridge Rehabilitation and Widening
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Under Construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Traffic shifted to east side for third phase of rehabilitation and widening project on East Medical Center Drive Bridge through June 20, 2025, with one vehicle lane in each direction remaining open. |
Original sector | Transportation |
Location
Country | United States of America (USA) |
State | Michigan |
City | Ann Arbor |
Source
Source | MLive |
URL |
More Details
Record type | Project |
Sector | Hospital, Bridge, Road |
Article published date | 2025-06-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
