logo

East Milton Water Service

Sector: Water Supply and Storage • Location: Milton, Florida, United States

Source: ArcGIS StoryMaps

Project
Approved

This 6.02-acre lot zoned M2 (General Industrial District) is a Public/Private Utility project to construct a 5,625 sq. ft. office including 1,050 sq. ft. of warehousing with 17 parking spaces, asphalt drives, sidewalks, and landscaping. The property was rezoned via case number 1994-R-023 approved on October 13th, 1994, which rezoned the property from AG to its current M2 zoning.

Status
Prospective
Sector
Water Supply and Storage, Manufacturing (Industrial), Warehouse, Road, Power Transmission, Power Generation (CCGT), Car parking, Commercial, Automotive, Residential
Location
Milton, Florida, United States of America
Updated
22 Jul 2026
Source
ArcGIS StoryMaps

ConstructChat

Ask ConstructChat about East Milton Water Service

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “East Milton Water Service” is an infrastructure initiative in the Water Supply and Storage sector, located in Milton, Florida, United States. Taiyo aggregates data on it from ArcGIS StoryMaps.

Participants

Not available for this record.

Status

Original status

approved

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

This 6.02-acre lot zoned M2 (General Industrial District) is a Public/Private Utility project to construct a 5,625 sq. ft. office including 1,050 sq. ft. of warehousing with 17 parking spaces, asphalt drives, sidewalks, and landscaping. The property was rezoned via case number 1994-R-023 approved on October 13th, 1994, which rezoned the property from AG to its current M2 zoning.

Original sector

Built Environment

Location

Country

United States of America (USA)

State

Florida

City

Milton

Source

Source

ArcGIS StoryMaps

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Manufacturing (Industrial), Warehouse, Road, Power Transmission, Power Generation (CCGT), Car parking, Commercial, Automotive, Residential

Article published date

2026-04-23

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project