East Nizhoni Boulevard Reconstruction REBID
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
This project is to improve both vehicular and pedestrian traffic with ADA ramps and crossing as well as through lane for northbound traffic on to 2nd Street. The project includes improvements to the existing traffic control systems, replacement of the existing 8-inch AC and CI effluent line, with a new 12 DI line and replacement of the existing 8 CI waterline new 8 DI waterline.
- Status
- Closed
- Sector
- Water Supply and Storage, Government, Road, Commercial, Waste Processing and Treatment, Car parking, Automotive
- Location
- Gallup, New Mexico, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about East Nizhoni Boulevard Reconstruction REBID
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project is to improve both vehicular and pedestrian traffic with ADA ramps and crossing as well as through lane for northbound traffic on to 2nd Street. The project includes improvements to the existing traffic control systems, replacement of the existing 8-inch AC and CI effluent line, with a new 12 DI line and replacement of the existing 8 CI waterline new 8 DI waterline. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | New Mexico |
City | Gallup |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Road, Commercial, Waste Processing and Treatment, Car parking, Automotive |
Article published date | 2025-03-31 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
