East Pilbara Network Project (EPN)
Sector: Power Generation (CCGT) • Location: Port Hedland, Newman, Western Australia, Australia
Source: RenewEconomy
The East Pilbara Network Project is a common-use electricity transmission line connecting APA's Port Hedland and Newman Power Stations and the Burrup (Murujuga) Corridor. It aims to unify power networks built by iron ore mining companies and support the transition from gas and diesel to renewables and storage in the region.
- Status
- Prospective
- Sector
- Power Generation (CCGT), Steel, Metal
- Location
- Port Hedland, Newman, Western Australia, Australia
- Updated
- 22 Jul 2026
- Source
- RenewEconomy
ConstructChat
Ask ConstructChat about East Pilbara Network Project (EPN)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The East Pilbara Network Project is a common-use electricity transmission line connecting APA's Port Hedland and Newman Power Stations and the Burrup (Murujuga) Corridor. It aims to unify power networks built by iron ore mining companies and support the transition from gas and diesel to renewables and storage in the region. |
Original sector | Energy |
Location
Country | Australia |
State | Western Australia |
City | Port Hedland, Newman |
Source
Source | RenewEconomy |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Steel, Metal |
Article published date | 2025-06-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
