logo

East River Crossing over East Branch River Bridge Replace

Sector: Road • Location: Cortland, New York, United States of America

Source: Dodge

Project
Closed

The work includes providing all labor, materials, machinery, tools, equipment and other means of construction necessary and incidental to the completion of the work shown on the Plans and described in these Specifications including, but not necessarily limited to the following: Remove and replace the existing East River Crossing bridge and reconstruct approximately 800 linear feet of approach road

Status
Closed
Sector
Road, Bridge, Commercial, Government
Location
Cortland, New York, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about East River Crossing over East Branch River Bridge Replace

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “East River Crossing over East Branch River Bridge Replace” is an infrastructure initiative in the Road sector, located in Cortland, New York, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The work includes providing all labor, materials, machinery, tools, equipment and other means of construction necessary and incidental to the completion of the work shown on the Plans and described in these Specifications including, but not necessarily limited to the following: Remove and replace the existing East River Crossing bridge and reconstruct approximately 800 linear feet of approach roadway along East River Crossing to tie the proposed structure into the adjacent highway.

Procurement method

Budget

Location

Country

United States of America (USA)

State

New York

City

Cortland

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Road, Bridge, Commercial, Government

Article published date

2025-08-25

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project