East River Interceptor Rehabilitation
Sector: Water Supply and Storage • Location: Green Bay, Wisconsin, United States of America
Source: Dodge USA
The Project consists of: Renewal of the East River Interceptor, including but not limited to: renewal of 30-, 42-, and 48-inch concrete interceptors with CIPP liner, renewal of existing manholes with FRP inserts and coating systems, abandonment of 24 and 30-inch concrete interceptors, temporary conveyance of wastewater during construction, restoration of roadways and landscaped areas.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The Project consists of: Renewal of the East River Interceptor, including but not limited to: renewal of 30-, 42-, and 48-inch concrete interceptors with CIPP liner, renewal of existing manholes with FRP inserts and coating systems, abandonment of 24 and 30-inch concrete interceptors, temporary conveyance of wastewater during construction, restoration of roadways and landscaped areas. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
