East River Tunnel Rehab Project
Planned · New York · Last reported May 2025
Source: CBS News
The East River Tunnel Rehab Project aims to repair two of the four tubes damaged by Superstorm Sandy in 2012. Amtrak plans to fully close both tubes for 13 months each, with a three-month break in between repair jobs, to minimize disruptions to service and customers.
- Status
- Prospective
- Sector
- Tunnel
- Location
- New York City, New York, United States of America
- Updated
- 22 Jul 2026
- Source
- CBS News
ConstructChat
Ask ConstructChat about East River Tunnel Rehab Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The East River Tunnel Rehab Project aims to repair two of the four tubes damaged by Superstorm Sandy in 2012. Amtrak plans to fully close both tubes for 13 months each, with a three-month break in between repair jobs, to minimize disruptions to service and customers. |
Location
Country | United States of America (USA) |
State | New York |
City | New York City |
Source
Source | CBS News |
URL |
More Details
Record type | Project |
Sector | Tunnel |
Article published date | 2025-05-11 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
