logo

East Rockingham Waste to Energy

Sector: Biomass • Location: Australia

Source: Australian Renewable Energy Agency (ARENA)

Project
Current

The East Rockingham Waste to Energy project will process up to 330,000 tonnes of residual waste per annum and recover energy to produce 28.9 MW of power. The East Rockingham Waste to Energy project addresses two major challenges facing Australia; delivering sustainable and affordable solutions for both electricity generation and waste management.Australia disposes over 23 million tonnes of waste t

Project Information FAQ

Project Information

5 Q
The project “East Rockingham Waste to Energy” is an infrastructure initiative in the Biomass sector, located in Australia. Taiyo aggregates data on it from Australian Renewable Energy Agency (ARENA).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

current

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The East Rockingham Waste to Energy project will process up to 330,000 tonnes of residual waste per annum and recover energy to produce 28.9 MW of power. The East Rockingham Waste to Energy project addresses two major challenges facing Australia; delivering sustainable and affordable solutions for both electricity generation and waste management.Australia disposes over 23 million tonnes of waste to landfill every year, with Western Australia having the highest waste generation rate per capita coupled with the lowest recovery rate.There are significant environmental costs to land, air and water associated with landfilling. For example, Perth is built on a sandy coastal plain that relies heavily on groundwater as its primary source of potable water. As readily accessible landfill sites reach capacity, and with no new metropolitan landfill sites likely to be approved, it is imperative to adopt other solutions to improve waste diversion rates.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data