East Side Coastal Resiliency
Sector: Car parking • Location: NY, United States of America
Source: US Department of Transportation (USDOT)
Other Agencies with Actions or Authorizations: Department of Commerce, National Oceanic and Atmospheric Administration New York Department of the Army, US Army Corps of Engineers - Regulatory Description: The East Side Coastal Resiliency project (ESCR) is a comprehensive urban water management project designed to reduce the risk of floods from coastal storm surges and/or flooding from high-intensi
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Close |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Other Agencies with Actions or Authorizations: Department of Commerce, National Oceanic and Atmospheric Administration New York Department of the Army, US Army Corps of Engineers - Regulatory Description: The East Side Coastal Resiliency project (ESCR) is a comprehensive urban water management project designed to reduce the risk of floods from coastal storm surges and/or flooding from high-intensity rainfall events. The Proposed Rebuild by Design Project would be located in the Borough of Manhattan, NY (the Project Area). The purpose of the Proposed Project is to address coastal flooding vulnerability in a manner that reduces the flooding risk while enhancing waterfront open spaces and access to the waterfront. The principal objectives of the Proposed Project are as follows: (1) provide a reliable coastal flood protection system against the design storm event for the protected area; (2) improve access to, and enhance open space resources along the waterfront, including East River Park and Stuyvesant Cove Park; (3) respond quickly to the urgent need for flood protection and resiliency, particularly for communities that have a large concentration of residents in affordable and public housing units along the proposed project area; and (4) achieve implementation milestones and comply with the conditions attached to funding allocations as established by HUD, including scheduling milestones. The Proposed Project was paused in August 2018 while the Community Development Block Grant-Disaster Recovery grantee New York City Office of Management, in cooperation with the Project lead New York City Department of Design and Construction and project partner New York City Department of Parks and Recreation re-evaluated the project design. That re-evaluation resulted in a newly identified preferred alternative that is analyzed in the DEIS made available for public comment on April 5, 2019. Additional Information |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
