logo

East Trunk Sewer Line Replacement Phase 1 & 2

Sector: Road • Location: Fairfield, Connecticut, United States of America

Source: Dodge USA

Project
Bid Results

Provide all labor, materials, equipment, and all else necessary for Phase 1 that requires the installation of the 36 reinforced concrete pipe sewer piping and associated work for the East Trunk Sewer that includes replacement of the existing interceptor sewer with a new 36 inch diameter reinforced concrete pipe running on a new alignment beneath existing streets

Status
Closed
Sector
Road, Government, Commercial, Waste Processing and Treatment, Water Supply and Storage, Cement
Location
Fairfield, Connecticut, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about East Trunk Sewer Line Replacement Phase 1 & 2

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “East Trunk Sewer Line Replacement Phase 1 & 2” is an infrastructure initiative in the Road sector, located in Fairfield, Connecticut, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Bid Results

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Provide all labor, materials, equipment, and all else necessary for Phase 1 that requires the installation of the 36 reinforced concrete pipe sewer piping and associated work for the East Trunk Sewer that includes replacement of the existing interceptor sewer with a new 36 inch diameter reinforced concrete pipe running on a new alignment beneath existing streets

Procurement method

Budget

Location

Country

United States of America (USA)

State

Connecticut

City

Fairfield

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Road, Government, Commercial, Waste Processing and Treatment, Water Supply and Storage, Cement

Article published date

2024-09-16

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project