Eastanollee Creek WPCP Improvements - Phase II
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
The work to be done shall consist of furnishing all equipment and materials and performing all labor necessary to remove and replace existing process equipment including aeration basin aeration and mixing systems, RAS pumps, polymer feed systems, UV disinfection system, digester aeration and mixing systems, sludge transfer pumps and slide gates, utility washwater pumps; plus completion of building
- Status
- Closed
- Sector
- Commercial, Chemical (Industrial), Power Transmission, Waste Processing and Treatment, Power Generation (CCGT), Government, Manufacturing (Industrial), Water Supply and Storage
- Location
- Toccoa, Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Eastanollee Creek WPCP Improvements - Phase II
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The work to be done shall consist of furnishing all equipment and materials and performing all labor necessary to remove and replace existing process equipment including aeration basin aeration and mixing systems, RAS pumps, polymer feed systems, UV disinfection system, digester aeration and mixing systems, sludge transfer pumps and slide gates, utility washwater pumps; plus completion of building & laboratory modifications, electrical system modifications, and construction & installation of ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Georgia |
City | Toccoa |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Chemical (Industrial), Power Transmission, Waste Processing and Treatment, Power Generation (CCGT), Government, Manufacturing (Industrial), Water Supply and Storage |
Article published date | 2024-01-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
