Eastern Gateway Phase 1
Sector: Water Supply and Storage • Location: Charlottetown, Prince Edward Island, Canada
Source: Dodge USA
The Work generally includes the reconstruction of Grafton Street from the Holland College Area to Riverside Drive Area. Work on this project consists generally of, but not limited to, the following: .1 Removals and disposal; .2 Environmental protection; .3 Watermain replacement; .4 Sanitary sewer renewal; .5 Storm sewer renewal and catch basin installation; .6 Service renewals; .7 Accommodating ex
- Status
- Closed
- Sector
- Water Supply and Storage, Car parking, Power Generation (CCGT), Road, Waste Processing and Treatment, Power Transmission, Government, Automotive, Commercial
- Location
- Charlottetown, Prince Edward Island, Canada
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Eastern Gateway Phase 1
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Work generally includes the reconstruction of Grafton Street from the Holland College Area to Riverside Drive Area. Work on this project consists generally of, but not limited to, the following: .1 Removals and disposal; .2 Environmental protection; .3 Watermain replacement; .4 Sanitary sewer renewal; .5 Storm sewer renewal and catch basin installation; .6 Service renewals; .7 Accommodating existing infrastructure; .8 Traffic signal bases, traffic controller cabinet base and underground c... |
Procurement method | |
Budget |
Location
Country | Canada |
State | Prince Edward Island |
City | Charlottetown |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Car parking, Power Generation (CCGT), Road, Waste Processing and Treatment, Power Transmission, Government, Automotive, Commercial |
Article published date | 2024-02-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
