Eastern Goldfields Power Projects
Sector: Power Generation (CCGT) • Location: Kalgoorlie, Western Australia, Australia
Source: TS2
A 25-year renewable power project including 256 MW wind generation, 138 MW solar generation, 138 MW / 300 MWh battery storage, supported by a 120 MW thermal generation joint venture and a new 132 kV transmission network and substations to supply energy to Northern Star's Kalgoorlie Consolidated Gold Mines (KCGM) operations.
- Status
- Prospective
- Sector
- Power Generation (CCGT), Solar, Geothermal, Wind, Power Transmission, Energy Storage
- Location
- Kalgoorlie, Western Australia, Australia
- Updated
- 22 Jul 2026
- Source
- TS2
ConstructChat
Ask ConstructChat about Eastern Goldfields Power Projects
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | A 25-year renewable power project including 256 MW wind generation, 138 MW solar generation, 138 MW / 300 MWh battery storage, supported by a 120 MW thermal generation joint venture and a new 132 kV transmission network and substations to supply energy to Northern Star's Kalgoorlie Consolidated Gold Mines (KCGM) operations. |
Original sector | Energy |
Location
Country | Australia |
State | Western Australia |
City | Kalgoorlie |
Source
Source | TS2 |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Solar, Geothermal, Wind, Power Transmission, Energy Storage |
Article published date | 2025-12-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
