logo
Project

Eastern Nile Power Trade Program Study

Sector: Residential • Location: Multinational

Source: African Development Bank (AfDB)

The present project is relative to the Eastern Nile Power Trade Programme Study. It is part of a coordinated Investment Program consisting of priority power generation and transmission interconnection projects with trans-boundary benefits. The study aims at providing a framework for coordinated planning of generation and transmission interconnection projects for Ethiopia, Egypt, and Sudan, thereby

Sector
Residential, Commercial, Power Generation (CCGT), Government
Location
World
Updated
22 Jul 2026
Source
African Development Bank (AfDB)

ConstructChat

Ask ConstructChat about Eastern Nile Power Trade Program Study

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Eastern Nile Power Trade Program Study” is an infrastructure initiative in the Residential sector, located in Multinational. Taiyo aggregates data on it from African Development Bank (AfDB).

Participants

Sponsoring Agency

Status

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The present project is relative to the Eastern Nile Power Trade Programme Study. It is part of a coordinated Investment Program consisting of priority power generation and transmission interconnection projects with trans-boundary benefits. The study aims at providing a framework for coordinated planning of generation and transmission interconnection projects for Ethiopia, Egypt, and Sudan, thereby allowing selection of least cost projects with trans-boundary benefits for the three countries. A power trade strategy should create an enabling environment through harmonizing grid codes, establishing necessary institutions, control centers, communication networks, computing facilities, trading rules and settlement arrangements that are vital for power trade. The outcome of the Study, among others should include the Power Trade Strategy, Regional Investment Program and Memoranda of Understanding to be executed by the countries for implementing the trade strategy and investment program. The study should be carried out in two phases, namely: I) Cooperative Regional Assessment of Power Trade Opportunities; and II) Feasibility Study of the Power Interconnection involving Ethiopia, Egypt, and Sudan. The Cooperative Regional Assessment should distribute the costs and benefits of the regional projects between the countries and enable them implement the recommended projects. In addition, the feasibility study of the power interconnection project, which is to be prepared as part of the Study, represents a decisive step towards establishing an integrated power system and eventually a power pool for resources and electricity trade.

Original sector

Energy

Budget

Location

Country

World

Source

Source

African Development Bank (AfDB)

URL

More Details

Record type

Project

Sector

Residential, Commercial, Power Generation (CCGT), Government

Article published date

2025-03-26

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project