Eastern Railway Line PPP project
Sector: Government • Location: Ghana
Source: InfraPPPWorld
This project involves the modernization of the Eastern Railway Line, which stretches for about 340 km from Accra to Kumasi with a branch rail line from Achimota to Tema Port. It was built in 1923. Currently, it is virtually non-operational, due to severe dilapidation. The project will include the financing, development, construction, operation, and maintenance of the 340km line as well as the pro
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | project signed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | This project involves the modernization of the Eastern Railway Line, which stretches for about 340 km from Accra to Kumasi with a branch rail line from Achimota to Tema Port. It was built in 1923. Currently, it is virtually non-operational, due to severe dilapidation. The project will include the financing, development, construction, operation, and maintenance of the 340km line as well as the provision of rolling stock, station upgrades, signaling, and communication equipment with the Government of Ghana having a 30 percent share. The project is also planned to have a branch line at Bososo to Kyebi to the proposed bauxite mines, and to be linked to the inland port at Boankra in the Ashanti Region. The upgraded rail system will consist of three major stations in Accra, Koforidua and Kumasi and 30 small stations along the line. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | Low |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
