Eastervale Solar Project
One of 10,000+ projects Taiyo tracks in Alberta.
Source: Dodge USA
Construction of a new solar facility near Provost that will be able to produce 300 MW of power, and a 200 MW battery energy storage system. The project was announced on November 3, 2022. The location on the map is not exact.
- Status
- Prospective
- Sector
- Energy Storage, Power Generation (CCGT), Solar, Commercial
- Location
- Calagary, Alberta, Canada
- Updated
- 19 Nov 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Eastervale Solar Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Pre-Design |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Construction of a new solar facility near Provost that will be able to produce 300 MW of power, and a 200 MW battery energy storage system. The project was announced on November 3, 2022. The location on the map is not exact. |
Budget |
Location
Country | Canada |
State | Alberta |
City | Calagary |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Energy Storage, Power Generation (CCGT), Solar, Commercial |
Article published date | 2024-02-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
