Eastervale Solar Project
Sector: Power Generation (CCGT) • Location: Alberta, Canada
Source: Penticton Herald
The Eastervale Solar Project was proposed to be a 300-megawatt solar power plant with a battery energy storage system, located on approximately 314 hectares of agricultural land in the M.D. of Provost. The Alberta Utilities Commission rejected the application due to concerns over environmental impacts and agricultural land use.
- Status
- Failure
- Sector
- Power Generation (CCGT), Energy Storage, Raw Materials, Solar
- Location
- Alberta, Canada
- Updated
- 22 Jul 2026
- Source
- Penticton Herald
ConstructChat
Ask ConstructChat about Eastervale Solar Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Cancelled |
Taiyo status | Failure |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Eastervale Solar Project was proposed to be a 300-megawatt solar power plant with a battery energy storage system, located on approximately 314 hectares of agricultural land in the M.D. of Provost. The Alberta Utilities Commission rejected the application due to concerns over environmental impacts and agricultural land use. |
Original sector | Energy |
Location
Country | Canada |
State | Alberta |
Source
Source | Penticton Herald |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Energy Storage, Raw Materials, Solar |
Article published date | 2025-03-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
