E.B Campbell Tail Race Pier Refurbishment
Sector: Cement • Location: Regina, Saskatchewan, Canada
Source: Dodge USA
The scope of this project comprises of performing repairs to the Tailrace Concrete piers at EB Campbell Hydroelectric station. The concrete between elevations in which the tailwater level fluctuates has severe deterioration across all eight (8) units of the power station requiring refurbishment to prevent further deterioration.
- Status
- Prospective
- Sector
- Cement, Power Generation (CCGT), Commercial
- Location
- Regina, Saskatchewan, Canada
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about E.B Campbell Tail Race Pier Refurbishment
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The scope of this project comprises of performing repairs to the Tailrace Concrete piers at EB Campbell Hydroelectric station. The concrete between elevations in which the tailwater level fluctuates has severe deterioration across all eight (8) units of the power station requiring refurbishment to prevent further deterioration. |
Procurement method | |
Budget |
Location
Country | Canada |
State | Saskatchewan |
City | Regina |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Cement, Power Generation (CCGT), Commercial |
Article published date | 2024-08-12 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
