EBHD Utility Improvements
Sector: Power Transmission • Location: Elephant Butte, New Mexico, United States of America
Source: Dodge USA
A.Replacement or installation of four utilities across the EBHD Site: 1.Replacement of the Sewer Lines. a.Removal of existing sewer lines including connections to existing manholes. b.Installation of PVC gravity sewer lines in place of the removed sewer piping including connections to existing manholes. c.Installation of force main. 2.Replacement of Water Lines. a.Removal of existing water lines.
- Status
- Closed
- Sector
- Power Transmission, Water Supply and Storage, Waste Processing and Treatment, Commercial, Power Generation (CCGT)
- Location
- Elephant Butte, New Mexico, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about EBHD Utility Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | A.Replacement or installation of four utilities across the EBHD Site: 1.Replacement of the Sewer Lines. a.Removal of existing sewer lines including connections to existing manholes. b.Installation of PVC gravity sewer lines in place of the removed sewer piping including connections to existing manholes. c.Installation of force main. 2.Replacement of Water Lines. a.Removal of existing water lines. b.Installation of new PVC water lines and appurtenances. c.Replacement of water system pumps. 3.D... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | New Mexico |
City | Elephant Butte |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Power Transmission, Water Supply and Storage, Waste Processing and Treatment, Commercial, Power Generation (CCGT) |
Article published date | 2024-08-12 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Transmission projects in United States of America
- FY 2018-JENKINS COUNTY-SEC.5311-OPERATIONS ONLY
- N CENTRAL AVE PEDESTRIAN &TRANSIT IMPROVEMENT STUDY-PHASE II
- MHA Nation Tribal Broadband Project
- Lower Elwha Klallam Tribe Tribal Broadband Connectivity Program
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- North Creek Trail Section 4-Phase 2 & 3
- Fine Arts and Housing Cooling Engineering Study
