logo

EBRD finances $7m flood-protection scheme in Erdenet, Mongolia

Sector: Government • Location: Erdenet, Mongolia

Source: Highways Today

Project
Ongoing

More than 15,000 people will directly benefit from sustainable infrastructure designed to protect them from seasonal flooding, thanks to a loan provided by the European Bank for Reconstruction and Development (EBRD) to Erdenet, Mongolia’s second-largest municipality. A sovereign loan of up to US$7 million will help the northern Mongolian town, located in the valley between the Selenga and Orkhon r

Project Information FAQ

Project Information

5 Q
The project “EBRD finances $7m flood-protection scheme in Erdenet, Mongolia” is an infrastructure initiative in the Government sector, located in Erdenet, Mongolia. Taiyo aggregates data on it from Highways Today.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

ongoing

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

More than 15,000 people will directly benefit from sustainable infrastructure designed to protect them from seasonal flooding, thanks to a loan provided by the European Bank for Reconstruction and Development (EBRD) to Erdenet, Mongolia’s second-largest municipality. A sovereign loan of up to US$7 million will help the northern Mongolian town, located in the valley between the Selenga and Orkhon rivers, implement modern flood-protection measures and improve its water supply system. It will help address the consequences of decades of underinvestment in the municipal water networks. This will improve the resilience of Erdenet’s water infrastructure to climate change and address public health challenges. The investment is aiming to increase by 3,200 the number of households connected to the central water supply and to reduce the volume of annual water losses by 15 per cent or 0.8 million cubic metres. The coronavirus pandemic has demonstrated the critical importance of the highest hygiene and sanitation standards, and water supply and treatment are among most serious longstanding challenges that the country is facing. In Mongolia the EBRD works to help build a diverse economy by developing the private sector and supporting infrastructure improvements. The Bank has invested more than €1.7 billion in 104 projects in the country since it started operations there in 2006.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data