EC 6th Floor Rest Room Renovation
One of 10,000+ projects Taiyo tracks in California.
Source: Dodge
Replace ceramic floor tiles, gypsum board walls, toilet partitions, plumbing fixtures, drywall, reframe existing ceiling for new lights, paint, new door frames, floor drains, furnish and install lavatories, sanitary waste and vent, electrical, new outlets, etc.
- Status
- Prospective
- Sector
- Consumer Products, Education, Power Generation (CCGT), Manufacturing (Industrial), Commercial, Waste Processing and Treatment
- Location
- Fullerton, California, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about EC 6th Floor Rest Room Renovation
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Start |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Replace ceramic floor tiles, gypsum board walls, toilet partitions, plumbing fixtures, drywall, reframe existing ceiling for new lights, paint, new door frames, floor drains, furnish and install lavatories, sanitary waste and vent, electrical, new outlets, etc. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Fullerton |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Consumer Products, Education, Power Generation (CCGT), Manufacturing (Industrial), Commercial, Waste Processing and Treatment |
Article published date | 2025-02-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Consumer Products projects in United States of America
- MIDTOWN CONNECTOR IMPROVEMENTS
- 98th avenue se (97th place se) and se 11th street slope stabilization
- REMOVE AND REPLACE FENCE, INSTALL ANTENNAS, POWER TRUNKS, RECTIFIERS, BREAKER AND BATTERY STRINGS
- CONVERT (E) DETACHED PERMITTED WORKSHOP INTO NEW ADU, INSTALL (N) FURNACE & TANKLESS W.H,RELOCATE (E)100A SUBPANEL
- WMATA Orange and Blue Line Rehabilitation
- Lake Nona Middle School
- Armature Works
- Anaheim Regional Transportation Intermodal Center
