logo
ProjectActive

EC Guayaquil Wastewater Management Project

Sector: Water Supply and Storage • Location: Ecuador

Source: World Bank Group

The project development objective for the Guayaquil Wastewater Management Project for Ecuador is to increase access to improved sanitation services and to reduce wastewater pollution in selected areas of the City of Guayaquil. The proposed Project will benefit over one million residents in the southern districts of Guayaquil and riparian districts of the Estero Salado where sewer mains will be reh

Status
Prospective
Sector
Water Supply and Storage, Power Transmission, Waste Processing and Treatment, Power Generation (CCGT), Government, Residential, Commercial
Location
Ecuador
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about EC Guayaquil Wastewater Management Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “EC Guayaquil Wastewater Management Project” is an infrastructure initiative in the Water Supply and Storage sector, located in Ecuador. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project development objective for the Guayaquil Wastewater Management Project for Ecuador is to increase access to improved sanitation services and to reduce wastewater pollution in selected areas of the City of Guayaquil. The proposed Project will benefit over one million residents in the southern districts of Guayaquil and riparian districts of the Estero Salado where sewer mains will be rehabilitated and new household connections will be installed and where poor households will enjoy eased conditions to get connected to the sewer network. This project is organized in four components. Component 1, installation of household connections, will provide support for the increasing of effective access to sewerage collection services within selected areas of the City of Guayaquil, through the installation and rehabilitation of household connections. Component 2, rehabilitation of sewerage network, will finance the rehabilitation of the sewerage network in La Chala basin (Suburbio Oeste area), which is riparian to the Estero Salado estuary. This component of the project aims at reducing infiltrations in the south sewerage subsystem, thus contributing to the reduction of contamination of the Estero Salado estuary from domestic wastewater. Component 3, wastewater treatment and disposal facilities, will treat 100 percent of the domestic wastewater of the southern districts of the City of Guayaquil in order to meet current environmental standards for discharges into the Guayas River. This component will finance the construction of: (i) a new wastewater treatment plant, called, to manage an average flow in dry and wet; (ii) the associated pumping and transmission facilities at Guasmo-H pumping station; (iii) pumping and transmission facilities at La Pradera pre-treatment station, and (iv) the construction of a sludge digester; and (v) the specialized independent supervision of the construction of the facilities described above. Component 4, project management and administration, including communication plan and management of social, environmental, and safety issues will provide support for: (i) activities associated with overall Project management by the Borrower, including those pertaining to the management of social, environmental and safety matters under the Project; (ii) Project-related audits; (iii) monitoring and evaluation activities; (iv) necessary equipment; (v) minor works required for the refurbishment of the PIU’s office; (vi) technical assistance; and (vii) training.

Original sector

FY17 - Water, Sanitation and Waste Management

Budget

Location

Country

Ecuador

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Power Transmission, Waste Processing and Treatment, Power Generation (CCGT), Government, Residential, Commercial

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project