logo

ECA LNG Phase 1 Export Terminal

Sector: Seaport • Location: Baja California, Mexico

Source: TotalEnergies.com

Project
Under Commissioning

ECA LNG Phase 1 is a liquefied natural gas (LNG) export terminal on Mexico's Pacific Coast with a single-train liquefaction facility having a nameplate LNG capacity of 3.25 million tonnes per annum. It liquefies U.S. natural gas sourced from the Permian Basin and is strategically located to serve Asian and Pacific Basin markets via the shortest maritime route. TotalEnergies holds a 16.6% stake and

Status
Under Construction
Sector
Seaport, Rail, Natural Gas, LNG, Commercial
Location
Baja California, Mexico
Updated
22 Jul 2026
Source
TotalEnergies.com

ConstructChat

Ask ConstructChat about ECA LNG Phase 1 Export Terminal

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “ECA LNG Phase 1 Export Terminal” is an infrastructure initiative in the Seaport sector, located in Baja California, Mexico. Taiyo aggregates data on it from TotalEnergies.com.

Participants

Not available for this record.

Status

Original status

under commissioning

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

ECA LNG Phase 1 is a liquefied natural gas (LNG) export terminal on Mexico's Pacific Coast with a single-train liquefaction facility having a nameplate LNG capacity of 3.25 million tonnes per annum. It liquefies U.S. natural gas sourced from the Permian Basin and is strategically located to serve Asian and Pacific Basin markets via the shortest maritime route. TotalEnergies holds a 16.6% stake and will offtake 1.7 million tonnes per year of LNG for 20 years starting from commercial operations.

Original sector

Energy

Location

Country

Mexico

State

Baja California

Source

Source

TotalEnergies.com

URL

More Details

Record type

Project

Sector

Seaport, Rail, Natural Gas, LNG, Commercial

Article published date

2026-07-11

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project