logo
ProjectUnder Commissioning

ECA LNG Phase 1 Terminal

One of 257 projects Taiyo tracks in Baja California.

Source: Petroleum Australia

The ECA LNG Phase 1 terminal is a single-train liquefaction plant with a total nameplate capacity of 3.25 Mtpa, located on Mexico's Pacific Coast in Baja California. It is supplied by natural gas from the Permian Basin and allows LNG exports to Asian markets via the shortest maritime route, bypassing the Panama Canal. TotalEnergies holds a 16.6% stake and will be the sole offtaker during the comme

Status
Under Construction
Sector
Seaport, Rail, LNG, Oil and Gas, Natural Gas, Water Supply and Storage, Commercial
Location
Baja California, Mexico
Updated
22 Jul 2026
Source
Petroleum Australia

ConstructChat

Ask ConstructChat about ECA LNG Phase 1 Terminal

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “ECA LNG Phase 1 Terminal” is an infrastructure initiative in the Seaport sector, located in Baja California, Mexico. Taiyo aggregates data on it from Petroleum Australia.

Participants

Not available for this record.

Status

Original status

under commissioning

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The ECA LNG Phase 1 terminal is a single-train liquefaction plant with a total nameplate capacity of 3.25 Mtpa, located on Mexico's Pacific Coast in Baja California. It is supplied by natural gas from the Permian Basin and allows LNG exports to Asian markets via the shortest maritime route, bypassing the Panama Canal. TotalEnergies holds a 16.6% stake and will be the sole offtaker during the commercial ramp-up phase, purchasing 1.7 Mtpa under a 20-year contract.

Original sector

Energy

Budget

Location

Country

Mexico

State

Baja California

Source

Source

Petroleum Australia

URL

More Details

Record type

Project

Sector

Seaport, Rail, LNG, Oil and Gas, Natural Gas, Water Supply and Storage, Commercial

Article published date

2026-07-16

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project