ECA LNG Phase 1 Terminal
Sector: Rail • Location: Baja California, Mexico
Source: IndexBox
ECA LNG Phase 1 is a single-train liquefaction plant with a capacity of 3.25 million tonnes per annum, located on Mexico's Pacific coast in Baja California. It uses natural gas from the Permian Basin in Texas and New Mexico and benefits from existing regasification infrastructure. The project aims to export LNG to Asian and Pacific Basin markets, reducing transportation time and costs.
- Status
- Under Construction
- Sector
- Rail, LNG, Natural Gas
- Location
- Baja California, Mexico
- Updated
- 22 Jul 2026
- Source
- IndexBox
ConstructChat
Ask ConstructChat about ECA LNG Phase 1 Terminal
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | commissioning phase |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | ECA LNG Phase 1 is a single-train liquefaction plant with a capacity of 3.25 million tonnes per annum, located on Mexico's Pacific coast in Baja California. It uses natural gas from the Permian Basin in Texas and New Mexico and benefits from existing regasification infrastructure. The project aims to export LNG to Asian and Pacific Basin markets, reducing transportation time and costs. |
Original sector | Energy |
Location
Country | Mexico |
State | Baja California |
Source
Source | IndexBox |
URL |
More Details
Record type | Project |
Sector | Rail, LNG, Natural Gas |
Article published date | 2026-07-12 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
