Echelon/Lockwood Glen Site Infrastructure Grading Services
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
The work required for Lockwood subdivision will be regrading existing of erosion, stabilizing, and removing old erosion control measures. The work required at Echelon subdivision will be removing woody debris from an outfall structure and removing old erosion control measures.
- Status
- Closed
- Sector
- Commercial, Manufacturing (Industrial), Government
- Location
- Franklin, Tennessee, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Echelon/Lockwood Glen Site Infrastructure Grading Services
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The work required for Lockwood subdivision will be regrading existing of erosion, stabilizing, and removing old erosion control measures. The work required at Echelon subdivision will be removing woody debris from an outfall structure and removing old erosion control measures. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Tennessee |
City | Franklin |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Commercial, Manufacturing (Industrial), Government |
Article published date | 2025-09-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
