Echo Lake Dam Improvements
Sector: Hydro • Location: Milford, Massachusetts, United States of America
Source: Dodge USA
ake Dam Improvements includes: Mobilize to the site. Establish access and staging areas. Install erosion and sediment control devices as required. Core 19, 6 diameter holes 20-feet into the stone masonry structure and install 2.5-diameter threaded anchor rods. Alt-1 includes the coring 38, 4 diameter holes 20-feet into the stone masonry structure and install 1.75-diameter threaded anchor rods Grou
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | ake Dam Improvements includes: Mobilize to the site. Establish access and staging areas. Install erosion and sediment control devices as required. Core 19, 6 diameter holes 20-feet into the stone masonry structure and install 2.5-diameter threaded anchor rods. Alt-1 includes the coring 38, 4 diameter holes 20-feet into the stone masonry structure and install 1.75-diameter threaded anchor rods Grout the threaded rods into place. Fabricate and install metal frames, grating walkway, and railing ... |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Hydro projects in United States of America
- Clearlake Affordable Housing Project
- Wichita & Affiliated Tribes Broadband Infrastructure Deployment Project and Broadband Use and Adoption Project
- Renovation of the potable water piping and distribution system from the Añarbe Dam to the Petritegi DWTP in Huesca (Spain)
- NEW SAVANNAH BLUFF LOCK & DAM REPAIR & RESTORATION - TIA
- INSTALL RCUT AT SR 515 & SR 325 (NOTELY DAM RD)
- Chabot Dam Upgrade
- Fiscal Year (FY) 2022 National Dam Safety Program (NDSP) - Region 8
- Fiscal Year (FY) 2019 National Dam Safety Program (NDSP) - Region 10
