Echo Lake Dam Improvements
Sector: Commercial • Location: Milford, Massachusetts, United States of America
Source: Dodge USA
ake Dam Improvements includes: Mobilize to the site. Establish access and staging areas. Install erosion and sediment control devices as required. Core 19, 6 diameter holes 20-feet into the stone masonry structure and install 2.5-diameter threaded anchor rods. Alt-1 includes the coring 38, 4 diameter holes 20-feet into the stone masonry structure and install 1.75-diameter threaded anchor rods Grou
- Status
- Closed
- Sector
- Commercial, Metal, Water Supply and Storage, Cement, Hydro, Rail, Waste Processing and Treatment, Manufacturing (Industrial), Government
- Location
- Milford, Massachusetts, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Echo Lake Dam Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | ake Dam Improvements includes: Mobilize to the site. Establish access and staging areas. Install erosion and sediment control devices as required. Core 19, 6 diameter holes 20-feet into the stone masonry structure and install 2.5-diameter threaded anchor rods. Alt-1 includes the coring 38, 4 diameter holes 20-feet into the stone masonry structure and install 1.75-diameter threaded anchor rods Grout the threaded rods into place. Fabricate and install metal frames, grating walkway, and railing ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Milford |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Metal, Water Supply and Storage, Cement, Hydro, Rail, Waste Processing and Treatment, Manufacturing (Industrial), Government |
Article published date | 2024-07-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in United States of America
- SR 3/US 19 FROM 0.14 MI S OF SR 7 TO HENRY COUNTY LINE
- SR 150 FROM 0.18 MI S OF CR 14/STERLING WELLS ROAD TO SR 47
- SR 61 FM PAULDING COUNTY LINE TO N OF CR 522/OLD ALABAMA RD
- COMMERCIAL DRIVE IN STATHAM
- SR 21 FROM 0.02 MI S OF SR 30 TO 0.24 MI S OF NS 916917C
- SR 155 FROM JONESBORO ROAD TO DEKALB COUNTY LINE
- SR 400 @ CR 9284/WINDWARD PKWY
- SR 49 FROM BIBB COUNTY LINE TO BALDWIN COUNTY LINE
