logo

EchoStar 105/ SES-11 Satellite

Sector: Aerospace & Defense • Location: Thailand

Source: Aerospace Technology

Project
Closed

EchoStar 105/SES-11 is dual-mission satellite launched in October 2017. Credit: SES SA. The satellite has 24 C-band and 24 Ku-band transponders. Credit: SES SA. The satellite was launched aboard Falcon 9 version 1.2 rocket manufactured by SpaceX. Credit: SpaceX. EchoStar 105/ SES-11, a dual-mission satellite, was launched into the geostationary transfer orbit (GTO) on-board Falcon 9 rocket from

Project Information FAQ

Project Information

4 Q
The project “EchoStar 105/ SES-11 Satellite” is an infrastructure initiative in the Aerospace & Defense sector, located in Thailand. Taiyo aggregates data on it from Aerospace Technology.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

EchoStar 105/SES-11 is dual-mission satellite launched in October 2017. Credit: SES SA. The satellite has 24 C-band and 24 Ku-band transponders. Credit: SES SA. The satellite was launched aboard Falcon 9 version 1.2 rocket manufactured by SpaceX. Credit: SpaceX. EchoStar 105/ SES-11, a dual-mission satellite, was launched into the geostationary transfer orbit (GTO) on-board Falcon 9 rocket from Kennedy Space Centre in Florida, US, in October 2017. Airbus designed and built the satellite for EchoStar Satellite Operating Corporation and SES World Skies. The satellite will be positioned at the 105° West orbital slot and will replace C-band capacity for AMC-18 and Ku-band capacity for AMC-15. The coverage areas of the satellite are in the Americas, including Alaska, Hawaii, Mexico, and the Caribbean. The new satellite is expected to be commercially operational by the end of November 2017. Airbus Defence and Space was awarded a contract for the construction of the EchoStar 105/ SES-11 satellite in September 2014. The satellite was manufactured at the Airbus facility located in Toulouse, France. The satellite has a launch mass of 5,200kg and is equipped with two deployable solar arrays and batteries, which can generate up to 12kW of power in space. It is designed to provide operations for 15 years. The satellite is based on the Eurostar-3000 platform developed by Airbus. It was transported to Cape Canaveral, Florida, US, for pre-launch operations in September 2017. The dual-mission EchoStar 105/SES-11 satellite is equipped with a C-band payload of 24 transponders and 24 Ku-band transponders of 36MHz. The C-band payload is offered as SES-11, while the Ku-band payload is offered as EchoStar 105 to meet the needs of EchoStar’s enterprise, media and broadcast, and US Government service provider customers. The satellite is designed to offer high-definition (HD) and ultra-high definition (UHD) channels to more than a hundred million TV homes. It replaces the C-band capacity for the AMC-18 satellite, which provides coverage over North America. The satellite offers the services with coverage over 50 US states and has an expanded reach to the Gulf of Mexico and the Caribbean. The satellite was launched on-board the Falcon 9 version 1.2 rocket designed and manufactured by SpaceX. The two-stage rocket has a height of 70m and diameter of 3.7m. It utilised RP-1 kerosene propellant and was oxidised by liquid oxygen fuel for lift-off. The first stage of the rocket was powered by nine Merlin-1D engines, while the second stage was powered by a single Merlin-1D engine. It was burned for two minutes and thirty-five seconds in the first stage, while the first burn in the second stage lasted for five minutes and 58 seconds, followed by the second burn for 16 minutes. The satellite was deployed into the targeted orbit in 36 minutes after the lift-off. The launch was performed from launch complex 39A located at Kennedy Space Centre in Florida. The liquid-fuelled engine equipped with the satellite will conduct three apogee burns and one perigee burn at the high and low points of orbit, and will guide the satellite in a circular geostationary orbit 22,300 miles directly over the equator. The satellite’s 24 C-band transponders will be controlled by SES, while the 24 Ku-band transponders will be controlled by EchoStar.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data