Echowater Facility Chiller Replacement
Sector: Water Supply and Storage • Location: Elk Grove, California, United States of America
Source: Dodge USA
Project includes demolition of existing chiller equipment and associated auxiliary equipment and accessories; construction of new chillers, associated mechanical equipment piping, accessories in the old blower room of the existing Influent/Effluent Building, installation of new electrical power feed system including outdoor transformers, indoor switchgears and MCCs in the electrical room of the In
- Status
- Closed
- Sector
- Water Supply and Storage, Government, Commercial, Road, Power Generation (CCGT), Waste Processing and Treatment
- Location
- Elk Grove, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Echowater Facility Chiller Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Project includes demolition of existing chiller equipment and associated auxiliary equipment and accessories; construction of new chillers, associated mechanical equipment piping, accessories in the old blower room of the existing Influent/Effluent Building, installation of new electrical power feed system including outdoor transformers, indoor switchgears and MCCs in the electrical room of the Influent Effluent Building and associated instrumentation controls and architectural and structural... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Elk Grove |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Commercial, Road, Power Generation (CCGT), Waste Processing and Treatment |
Article published date | 2024-11-25 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
