logo

Echuca-Moama Bridge Project

Sector: Automotive • Location: Australia

Source: Road Traffic Technology

Project
Closed

The Echuca-Moama Bridge project also includes road and intersection upgrades. Credit: Vicroads. The project will complement the old Murray River Road and rail bridge. Credit: Chris Fithall. The existing Murray River Bridge is inadequate to meet vehicular traffic demand during peak hours. Credit: Adrian Tritschler. The new Echuca-Moama Bridge is being constructed to create a second Murray River cro

Project Information FAQ

Project Information

5 Q
The project “Echuca-Moama Bridge Project” is an infrastructure initiative in the Automotive sector, located in Australia. Taiyo aggregates data on it from Road Traffic Technology.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Echuca-Moama Bridge project also includes road and intersection upgrades. Credit: Vicroads. The project will complement the old Murray River Road and rail bridge. Credit: Chris Fithall. The existing Murray River Bridge is inadequate to meet vehicular traffic demand during peak hours. Credit: Adrian Tritschler. The new Echuca-Moama Bridge is being constructed to create a second Murray River crossing between Echuca in New South Wales and Moama in Victoria, Australia. The locations are now connected by the heritage-listed Murray River Road Rail Bridge, which was built in 1878. The project is being implemented jointly by the Australian, Victorian and New South Wales Governments to reduce congestion on the existing bridge. Construction of the project officially began in October 2017, with an estimated investment of A$280m ($218m). The new bridge is expected to be used by more than 8,000 vehicles a day, upon its completion in late-2020. The existing bridge has nearly reached its maximum traffic capacity of more than 20,000 vehicles a day. The new bridge crossing is expected to reduce the traffic on the existing bridge by 40%, which is equivalent to 8,000 vehicles a day. It will also enable the movement of heavy vehicles and agricultural equipment to and from the city centre. An estimated 15% of the vehicles using the bridge will be trucks. The new bridge will be a 650m-long balanced cantilever structure with piers on the river banks, offering a 90m clear span over the river channel. The two-lane bridge is designed to carry higher mass limit and high-productivity freight vehicles. It will also facilitate the movement of vehicles with no height restrictions. Warren Street and the intersection at Perricoota Road will also be upgraded as part of the project. The new route will connect Cobb Highway in Moama through Campaspe River and Echuca Caravan Park. The new bridge will be constructed in four phases, the first of which commenced in October 2017. Phase one includes the replacement of the Y-intersection with a large roundabout and upgrade of the Murray Valley Highway. The existing intersection at Mt Terrick Road will also be renovated. In the second stage, the Homan Street and Redman Street intersection in Warren Street will be upgraded and new service roads and turning lanes constructed to provide better access to the Echuca cemetery. The bus stops will also be upgraded, four new bridges and off-road walking and cycling paths will be constructed, and enhanced stormwater drainage and intersection street lighting installed as part of the second stage. The new bridge over the Murray River, as well as a bridge road across the Campaspe River, will be built in the third stage. The intersection of Cobb Highway at Meninya Street and Perricoota Road will be upgraded during the fourth phase. The Australian, Victorian and New South Wales Governments committed A$97m ($75.5m), A$96m ($74.5m) and A$87m ($68m) respectively for the bridge construction. Roads and Maritime Services designed the fourth stage of the project, which includes the intersection of Cobb Highway into the new bridge road. RECivil was awarded a contract to undertake the first stage of the Echuca-Moama Bridge project in July 2017. The new Echuca-Moama Bridge will serve as an additional flood evacuation route. It will reduce the traffic congestion on the existing heavy vehicle route Murray Valley Highway, which links Echuca, Kyabram, Rochester, Moama and Shepparton. It will offer restriction-free access to higher mass limit and oversized commercial and emergency vehicles. The facilities at the Port of Echuca’s Heritage Precinct will be enhanced as part of the project. Shoppers and traders will be benefitted with the improved amenities. Risks for industrial operations will also be minimised with the new river crossing bridge.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data