Eckert Road Bridge Replacement in Boise
Sector: Road • Location: Boise, Idaho, United States
Source: NewsBreak: Local News & Alerts
Design and replacement of the Eckert Road bridge in Boise, which was shut down in January and reopened with temporary improvements in March. Funding has been secured through the state's Local Highway Technical Assistance Council. Reconstruction is tentatively scheduled for fall 2026.
- Status
- Prospective
- Sector
- Road, Bridge, Government
- Location
- Boise, Idaho, United States of America
- Updated
- 22 Jul 2026
- Source
- NewsBreak: Local News & Alerts
ConstructChat
Ask ConstructChat about Eckert Road Bridge Replacement in Boise
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Design and replacement of the Eckert Road bridge in Boise, which was shut down in January and reopened with temporary improvements in March. Funding has been secured through the state's Local Highway Technical Assistance Council. Reconstruction is tentatively scheduled for fall 2026. |
Original sector | Transportation |
Location
Country | United States of America (USA) |
State | Idaho |
City | Boise |
Source
Source | NewsBreak: Local News & Alerts |
URL |
More Details
Record type | Project |
Sector | Road, Bridge, Government |
Article published date | 2025-09-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
